In Abu Dhabi the scan usually has to exist on paper before anyone cuts. Government, healthcare, oil and gas and larger commercial sites tend to run a permit to work, and the permit wants evidence that the slab was surveyed. We scan with our concrete scanner, mark the safe positions on the concrete and issue a report written for that file. Attendance is usually next day.
- DED Dubai licence 844806
- Same-day response in Dubai
- All 7 emirates
Get a price for this job
Send the site location, the element or ground, the area and your date. We call you back with a fixed price. Attendance in Abu Dhabi: usually next day; permit-to-work sites take longer.
GPR Concrete Scanning in Abu Dhabi
Plan the scan into the permit, not the morning of the cut
Where a permit to work applies, the sequence is scan, report, permit approval, then coring. Calling the scanner on the day the core is due usually means the crew waits. Book the scan a few days ahead of the cut and the permit can be raised on our report. We arrange gate passes and site inductions before we mobilise rather than losing a day at the gate.
Industrial slabs in Mussafah and ICAD
Workshop and warehouse floors in Mussafah and the ICAD zones are built for machinery: thickened, densely reinforced, and often modified by several occupiers. Clustered anchor holes for a machine base suit a grid scan of the whole zone, so every position is cleared in one pass. Where a slab is thicker than we can image with confidence, the report says so.
Hospitals, offices and island towers
Sites we have worked on in Abu Dhabi include healthcare, corporate and retail buildings, such as Sheikh Khalifa Hospital, ADNOC Headquarters and Yas Mall. Work in a hospital or an occupied office means scanning around people who cannot be moved, which GPR allows because it needs no exclusion zone. The newer towers on Al Reem and the commercial blocks on the island are typically post-tensioned, and there every penetration is scanned.
Where in Abu Dhabi, and how fast
We cover Abu Dhabi Island and the Corniche, Al Reem, Saadiyat, Yas, Khalifa City, Mussafah, ICAD and Al Shamkha. Attendance is usually next day for the city and surrounding zones. Sites that need inductions or a permit take longer, and we confirm the date once we know the site's process.
Areas we cover in Abu Dhabi
- Abu Dhabi Island & Corniche
- Mussafah
- ICAD I–III
- Khalifa City
- Al Reem Island
- Yas Island
- Saadiyat Island
- Al Shamkha
Utility owners and permitting bodies we work alongside here: Abu Dhabi City Municipality, ADDC, Department of Municipalities and Transport, ADNOC site permitting.
Concrete you will meet in Abu Dhabi
Soil does not affect concrete scanning: the radar reads the inside of the element, so its range is the same anywhere. What changes is the structure. Industrial floors in Mussafah and ICAD are thick and heavily reinforced. Island towers are mostly post-tensioned. Older government and institutional buildings are usually conventionally reinforced, with drawings that may not match what was built. The sabkha that limits radar in the ground matters only for the separate ground utility survey.
What you get in Abu Dhabi
What you receive
- Rebar, tendons and conduits marked on the concrete surface on the day
- Safe drilling or coring positions marked before you start
- PDF report within 24 hours: marked-up layout, depth of each object, safe zones
- 3D scan data on request, for consultants who want to review it
Check us before you book
- Trade licence
- 844806, DED Dubai
- Registered office
- Office A-51, Al Shaikh Building 05, Al Khabeesi, Deira, Dubai, United Arab Emirates
- Operating since
- 2019
Sites we have worked on in Abu Dhabi include Yas Mall, ADNOC Headquarters, Al Dar Properties, Sheikh Khalifa Hospital, SKH Abu Dhabi. See the project list
GPR Concrete Scanning in Abu Dhabi: common questions
Can your report support an Abu Dhabi permit to work?
That is what it is written for. It shows the area scanned, the reinforcement, tendons and conduits found with their depths, the positions cleared, the date and any limits. What a permit needs differs by client and site, so send us the permit conditions and we will make sure the report covers them.
How far ahead should we book a scan in Abu Dhabi?
Where a permit to work applies, book a few days before the planned cut so the permit can be raised on our report. Where no permit is needed, next-day attendance is usual. The approval process, not our availability, is normally what sets the date.
Have you worked on government and oil and gas sites in Abu Dhabi?
Abu Dhabi sites we have worked on include ADNOC Headquarters, Sheikh Khalifa Hospital, Yas Mall and Al Dar Properties developments. We are used to site inductions, gate passes and permit-to-work sequences, and plan mobilisation around them.
Does sabkha ground affect concrete scanning?
No. Concrete scanning images the inside of a concrete element, so the ground around it does not matter and the same range applies anywhere. Sabkha does reduce depth for the separate ground survey used before excavation.
Related guides
- Working with us, 7 min readWhat is in a GPR survey report, and how to read one
The marks on site get the job done today. The report is what your consultant, your permit and your file keep. What it should contain, and what to question.
- Concrete scanning, 8 min readPost-tension cable detection: how tendons are found in UAE slabs
Tendons do not sit at one depth, they bunch along column lines, and they look a lot like rebar to a careless reader. How post-tension scanning actually works.
- Concrete scanning, 8 min readHow accurate is GPR concrete scanning? The real limits
Position, depth and certainty are three different questions, and GPR answers them with different confidence. An honest account of what a concrete scan can and cannot tell you.
Related pages
GPR Concrete Scanning elsewhere in the UAE
Other services in Abu Dhabi
Need GPR concrete scanning in Abu Dhabi?
Send the site and what you need done. We reply within 1 hour during working hours with a price and a date. Attendance in Abu Dhabi: usually next day; permit-to-work sites take longer.