Excavation in Dubai & the UAE, Surveyed Before We Dig
Trenching, foundations and site preparation, dug to a GPR survey we carry out ourselves. Buried services are painted on the ground and hand-dig zones agreed before any machine breaks ground.
- DED Dubai licence 844806
- Same-day response in Dubai
- All 7 emirates
Get a price for this job
Send the site location, the element or ground, the area and your date. We call you back with a fixed price.
Excavation that starts with a survey
Every excavation we carry out starts with a GPR ground survey of the dig area. We locate and paint out buried cables, pipes, ducts, tanks and voids, reconcile them with the authority drawings you hold, and agree where machines can dig and where the crew must hand dig. Then we excavate to that map. Because the same company surveys and digs, the crew is working to a survey it is answerable for.
What it finds
- Survey before every digGPR survey of the dig area, every time.
- Utility trenchingTrenches for cables, pipes and drainage.
- FoundationsExcavation for footings and basements.
- Site preparationClearing and levelling ahead of construction.
When you need it
- Utility trenches
- Foundation excavation
- Drainage installation
- Site preparation and grading
How an excavation job runs
Send the job
Location, what is being dug, approximate size and depth, any drawings or NOCs you hold, and your date.
Survey and paint out
GPR survey, services painted on the ground, hand-dig zones agreed.
Dig to the map
Excavation to the survey, with hand digging near marked services.
What you receive
What you receive
- Buried services painted on the ground with estimated depths
- PDF survey report within 24 hours with the mapped findings
- Marked-up drawing over your site plan for larger areas
- A stated depth limit wherever the ground stopped the radar
Need this on your site? Send the location and your date.
Areas we cover
Dubai, Abu Dhabi (including Al Ain), Sharjah, Ajman, Umm Al Quwain, Ras Al Khaimah and Fujairah, from our office in Deira.
Excavation: common questions
Do you survey the ground before every excavation?
Yes. Every dig starts with a GPR survey of the area. Services are painted on the ground with estimated depths and hand-dig zones are agreed before any machine breaks ground.
Does the survey replace our NOCs?
No. NOCs and authority drawings are still needed. The survey checks the drawings against what is in the ground, and any NOC conditions such as hand digging near an asset still apply.
Can you survey and excavate in one job?
Yes. That is the point of doing both: the crew digs to a survey made by the same company, so no information is lost between two contractors.
Related guides
- Ground scanning, 8 min readUnderground utility survey before excavation in Dubai: NOCs, DEWA, du and Etisalat
NOCs tell you what the service owners know about. A survey tells you what is in the ground. Why a Dubai excavation needs both, and in what order.
- Ground scanning, 7 min readGPR ground scanning vs trial pits: which one, and when you need both
A trial pit tells you exactly what is at one spot. Radar tells you roughly what is everywhere. The question is not which one, but in what order.
- Ground scanning, 6 min readWhat it costs when an excavator hits a live cable
Contractors weigh a survey against its invoice. The honest comparison is against the repair bill, the outage claim, the standstill and the incident report.
Need a dig surveyed and done?
Send the location, the size and depth of the dig and your date. We reply within 1 hour during working hours.
We reply within 1 hour during working hours. Email Bhadeyatechnical@gmail.com
